Bridge · Calapan South Road
Widening of permanent bridges - bambanin br. (B00017MR) along Calapan south rd., Victoria, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱23,520,000
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2022
- Bayan
- Victoria
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- DALCON CONSTRUCTION (40601) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)
- Simula
- Feb 21, 2022
- Katapusan
- Jan 30, 2023
- TAGAL
- 343 araw
- ID ng proyekto
- 22ED0029
ORAS
Timeline
Simula
Feb 21, 2022
343 araw mula simula
Katapusan
Jan 30, 2023
LOKASYON
Nasaan ito
Coordinates: 13.11521, 121.30033
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- WIDENING OF PERMANENT BRIDGES - BAMBANIN BR. (B00017MR) ALONG CALAPAN SOUTH RD., VICTORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Const. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro
Tapos naVictoria20182 bahagi ng daan
₱237.3 M
published na budgetBridge program- alcate bridge (B00027MR) along CSR jct.-minas road sta. 000+000.00-sta. 000+330.00, Victoria, Oriental Mindoro
IsinasagawaVictoria2025
₱217.0 M
published na budgetConstruction of missing links/new roads, Victoria-sablayan (Mindoro cross island road), package i, Oriental Mindoro
Tapos naVictoria2020
₱106.1 M
published na budgetConstruction of missing links/new roads Victoria-sablayan (Mindoro cross island road), Oriental Mindoro
Tapos naVictoria2021
₱98.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.