Construction of missing links/new roads, Victoria-sablayan (Mindoro cross island road), package i, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱106,149,286
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2020
- Bayan
- Victoria
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- STX ENTERPRISES (21547) / EQUI-PARCO CONSTRUCTION COMPANY
- Simula
- Feb 24, 2020
- Katapusan
- Dec 20, 2021
- TAGAL
- 665 araw
- ID ng proyekto
- 20E00006
ORAS
Timeline
Simula
Feb 24, 2020
665 araw mula simula
Katapusan
Dec 20, 2021
LOKASYON
Nasaan ito
Coordinates: 13.09839, 121.17858
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, VICTORIA-SABLAYAN (MINDORO CROSS ISLAND ROAD), PACKAGE I, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Const. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro
Tapos naVictoria20182 bahagi ng daan
₱237.3 M
published na budgetBridge program- alcate bridge (B00027MR) along CSR jct.-minas road sta. 000+000.00-sta. 000+330.00, Victoria, Oriental Mindoro
IsinasagawaVictoria2025
₱217.0 M
published na budgetConstruction of missing links/new roads Victoria-sablayan (Mindoro cross island road), Oriental Mindoro
Tapos naVictoria2021
₱98.4 M
published na budgetBridge · Calapan South Road
Tapos naVictoria2017
Rehabilitation/major repair of san isidro bridge (B00014MR) along Calapan south road, Victoria, Oriental Mindoro
₱32.6 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.