Skip to content

Const. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro

Tapos na

PUBLISHED NA BUDGET

₱237,282,858

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2018
Katayuan
Tapos na
Kategorya
Bridges
Contractor
STX ENTERPRISES (21547) / EQUI-PARCO CONSTRUCTION COMPANY
Simula
Oct 3, 2018
Katapusan
Dec 10, 2021
TAGAL
1,164 araw
ID ng proyekto
18E00070

ORAS

Timeline

Simula

Oct 3, 2018

1,164 araw mula simula

Katapusan

Dec 10, 2021

LOKASYON

Nasaan ito

Coordinates: 13.09833, 121.17857

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONST. OF MISSING LINK/NEW ROADS: VICTORIA-SABLAYAN (MINDORO CROSS ISLAND ROAD), PACKAGE I, INCLUDING BRIDGE, STA. 2+959.90-STA. 3+454.20, BRIDGE LENGTH= 494.30 L.M.; STA. 3+454.20-STA. 3+470, APPROACH B LENGTH= 15.80 L.M., VICTORIA, OR. MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.