Bridge program- alcate bridge (B00027MR) along CSR jct.-minas road sta. 000+000.00-sta. 000+330.00, Victoria, Oriental Mindoro
Isinasagawa
PUBLISHED NA BUDGET
₱217,029,278
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2025
- Bayan
- Victoria
- Katayuan
- Isinasagawa
- Kategorya
- Bridges
- Contractor
- PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION
- Simula
- Apr 6, 2025
- Katapusan
- -
- TAGAL
- -
- ID ng proyekto
- 25E00221
ORAS
Timeline
- Walang petsa sa dokumento. Walang petsa ng simula at katapusan.
LOKASYON
Nasaan ito
Coordinates: 13.17297, 121.18706
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- BRIDGE PROGRAM- ALCATE BRIDGE (B00027MR) ALONG CSR JCT.-MINAS ROAD STA. 000+000.00-STA. 000+330.00, VICTORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Const. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro
Tapos naVictoria20182 bahagi ng daan
₱237.3 M
published na budgetConstruction of missing links/new roads, Victoria-sablayan (Mindoro cross island road), package i, Oriental Mindoro
Tapos naVictoria2020
₱106.1 M
published na budgetConstruction of missing links/new roads Victoria-sablayan (Mindoro cross island road), Oriental Mindoro
Tapos naVictoria2021
₱98.4 M
published na budgetBridge · Calapan South Road
Tapos naVictoria2017
Rehabilitation/major repair of san isidro bridge (B00014MR) along Calapan south road, Victoria, Oriental Mindoro
₱32.6 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.