Construction of mayabig river control (sitio balikat), Baco, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱4,848,535
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2022
- Bayan
- Baco
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- E E CONSTRUCTION
- Simula
- Feb 20, 2022
- Katapusan
- Jun 3, 2022
- TAGAL
- 103 araw
- ID ng proyekto
- 22ED0015
ORAS
Timeline
Simula
Feb 20, 2022
103 araw mula simula
Katapusan
Jun 3, 2022
LOKASYON
Nasaan ito
Coordinates: 13.34585, 121.05658
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF MAYABIG RIVER CONTROL (SITIO BALIKAT), BACO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Sta
Tapos naBaco2024
Construction/improvement of Baco flood control system, brgy. sta. rosa II, Baco, Oriental Mindoro
₱111.0 M
published na budgetConstruction of dulangan river control (gabions), Baco, Oriental Mindoro
Tapos naBaco2017
₱45.7 M
published na budgetRepair/rehabilitation of alag flood control, Baco, Oriental Mindoro
Tapos naBaco2019
₱44.8 M
published na budgetConstruction of burbuli river control, Baco, Oriental Mindoro
Tapos naBaco2016
₱36.7 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.