Repair/rehabilitation of alag flood control, Baco, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱44,772,861
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2019
- Bayan
- Baco
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- CEFF TRADING & ENGINEERING SERVICES (39083) / FRAMECON BUILDERS
- Simula
- Dec 25, 2019
- Katapusan
- Aug 5, 2020
- TAGAL
- 224 araw
- ID ng proyekto
- 19ED0147
ORAS
Timeline
Simula
Dec 25, 2019
224 araw mula simula
Katapusan
Aug 5, 2020
LOKASYON
Nasaan ito
Coordinates: 13.37052, 121.07996
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- REPAIR/REHABILITATION OF ALAG FLOOD CONTROL, BACO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Sta
Tapos naBaco2024
Construction/improvement of Baco flood control system, brgy. sta. rosa II, Baco, Oriental Mindoro
₱111.0 M
published na budgetConstruction of dulangan river control (gabions), Baco, Oriental Mindoro
Tapos naBaco2017
₱45.7 M
published na budgetConstruction of burbuli river control, Baco, Oriental Mindoro
Tapos naBaco2016
₱36.7 M
published na budgetFlood control · Brgy. Pulangtubig
Tapos naBaco2019
Construction of protection dike (seawall) along brgy. pulangtubig, san andres and pambisan, Baco, Oriental Mindoro
₱29.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.