Flood control · Brgy. Sta
Construction/improvement of Baco flood control system, brgy. sta. rosa II, Baco, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱110,974,892
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2024
- Bayan
- Baco
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- ARCONIC INC.
- Simula
- Feb 8, 2024
- Katapusan
- Jan 8, 2025
- TAGAL
- 335 araw
- ID ng proyekto
- 24ED0041
ORAS
Timeline
Simula
Feb 8, 2024
335 araw mula simula
Katapusan
Jan 8, 2025
LOKASYON
Nasaan ito
Coordinates: 13.37950, 121.02158
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION/IMPROVEMENT OF BACO FLOOD CONTROL SYSTEM, BRGY. STA. ROSA II, BACO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of dulangan river control (gabions), Baco, Oriental Mindoro
Tapos naBaco2017
₱45.7 M
published na budgetRepair/rehabilitation of alag flood control, Baco, Oriental Mindoro
Tapos naBaco2019
₱44.8 M
published na budgetConstruction of burbuli river control, Baco, Oriental Mindoro
Tapos naBaco2016
₱36.7 M
published na budgetFlood control · Brgy. Pulangtubig
Tapos naBaco2019
Construction of protection dike (seawall) along brgy. pulangtubig, san andres and pambisan, Baco, Oriental Mindoro
₱29.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.