Construction of dulangan river control (gabions), Baco, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱45,686,820
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2017
- Bayan
- Baco
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- LUMEL GLENN CONSTRUCTION (26817) / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
- Simula
- Feb 23, 2017
- Katapusan
- Jan 15, 2018
- TAGAL
- 326 araw
- ID ng proyekto
- 17ED0019
ORAS
Timeline
Simula
Feb 23, 2017
326 araw mula simula
Katapusan
Jan 15, 2018
LOKASYON
Nasaan ito
Coordinates: 13.28316, 121.08147
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF DULANGAN RIVER CONTROL (GABIONS), BACO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Sta
Tapos naBaco2024
Construction/improvement of Baco flood control system, brgy. sta. rosa II, Baco, Oriental Mindoro
₱111.0 M
published na budgetRepair/rehabilitation of alag flood control, Baco, Oriental Mindoro
Tapos naBaco2019
₱44.8 M
published na budgetConstruction of burbuli river control, Baco, Oriental Mindoro
Tapos naBaco2016
₱36.7 M
published na budgetFlood control · Brgy. Pulangtubig
Tapos naBaco2019
Construction of protection dike (seawall) along brgy. pulangtubig, san andres and pambisan, Baco, Oriental Mindoro
₱29.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.