Restoration of alag river control approach a downstream, Baco, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱8,747,363
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2018
- Bayan
- Baco
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- CMSEL CONSTRUCTION & DEVELOPER
- Simula
- Mar 13, 2018
- Katapusan
- Oct 15, 2018
- TAGAL
- 216 araw
- ID ng proyekto
- 18ED0034
ORAS
Timeline
Simula
Mar 13, 2018
216 araw mula simula
Katapusan
Oct 15, 2018
LOKASYON
Nasaan ito
Coordinates: 13.36968, 121.08008
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- RESTORATION OF ALAG RIVER CONTROL APPROACH A DOWNSTREAM, BACO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Sta
Tapos naBaco2024
Construction/improvement of Baco flood control system, brgy. sta. rosa II, Baco, Oriental Mindoro
₱111.0 M
published na budgetConstruction of dulangan river control (gabions), Baco, Oriental Mindoro
Tapos naBaco2017
₱45.7 M
published na budgetRepair/rehabilitation of alag flood control, Baco, Oriental Mindoro
Tapos naBaco2019
₱44.8 M
published na budgetConstruction of burbuli river control, Baco, Oriental Mindoro
Tapos naBaco2016
₱36.7 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.