Skip to content

Construction of flood control structure within alag (malaylay - Baco) river, Baco, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱6,548,967

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2017
Bayan
Baco
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
LUMEL GLENN CONSTRUCTION
Simula
Nov 20, 2017
Katapusan
May 3, 2018
TAGAL
164 araw
ID ng proyekto
17ED0145

ORAS

Timeline

Simula

Nov 20, 2017

164 araw mula simula

Katapusan

May 3, 2018

LOKASYON

Nasaan ito

Coordinates: 13.40930, 121.11650

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITHIN ALAG (MALAYLAY - BACO) RIVER, BACO, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.