Bridge · Csr Jct. Minas Road
Replacement of mainao bridge (B00025MR) along CSR jct. minas road, Victoria, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱13,545,526
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2017
- Bayan
- Victoria
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
- Simula
- Mar 14, 2017
- Katapusan
- Oct 24, 2017
- TAGAL
- 224 araw
- ID ng proyekto
- 17ED0037
ORAS
Timeline
Simula
Mar 14, 2017
224 araw mula simula
Katapusan
Oct 24, 2017
LOKASYON
Nasaan ito
Coordinates: 13.18825, 121.20794
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- REPLACEMENT OF MAINAO BRIDGE (B00025MR) ALONG CSR JCT. MINAS ROAD, VICTORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Const. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro
Tapos naVictoria20182 bahagi ng daan
₱237.3 M
published na budgetBridge program- alcate bridge (B00027MR) along CSR jct.-minas road sta. 000+000.00-sta. 000+330.00, Victoria, Oriental Mindoro
IsinasagawaVictoria2025
₱217.0 M
published na budgetConstruction of missing links/new roads, Victoria-sablayan (Mindoro cross island road), package i, Oriental Mindoro
Tapos naVictoria2020
₱106.1 M
published na budgetConstruction of missing links/new roads Victoria-sablayan (Mindoro cross island road), Oriental Mindoro
Tapos naVictoria2021
₱98.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.