PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
2,746
sa buong lalawigan
PUBLISHED NA BUDGET
₱77.17 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
89%
2,451 sa 2,746 proyektong may katayuan
LOKASYON
2,487 proyekto ang nasa mapa. 259 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Rehab/reconst/upgrading of damaged paved Calapan south rd., or. Mindoro,K0103+000-K0103+594, K0107+(1016) | 2016 | ₱316,577,056 |
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Flood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro | 2024 | ₱289,496,392 |
| Basic infrastructure program (BIP)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase i, Naujan, or. Mindoro | 2024 | ₱287,199,000 |
| Sustainable infrastructure pojects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang ubi river, brgy. tagumpay, phase v, Naujan, or. Mindoro | 2024 | ₱280,178,100 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along dulangan river, brgy. evangelista, phase i, Naujan, Oriental Mindoro | 2024 | ₱280,114,708 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting m,ajor/strategic public buildings/fcilities- const. of road dike along m,ag-asawang tubig river, brgy. tagumpay, phase III, Naujan, Oriental Mindoro | 2024 | ₱280,065,668 |
Ipinapakita ang 211–220 sa 2,746, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Construction of missing links/new roads Bulalacao-san jose road (Bulalacao section), sta. 0+000-sta. 0+044.60; sta. 0+105.40-sta. 1+302; sta. 0+066.60-sta. 0+105.40, Oriental Mindoro | Bulalacao | 2021 | Tapos na | ₱96,498,930 |
| Rehabilitation · Brgy. Bayanan Rehabilitation of road, barangay palhi - barangay bayanan, Calapan city,Oriental Mindoro | Calapan City | 2025 | Tapos na | ₱96,498,914 |
| Asphalt overlay · Calapan South Road Asphalt overlay along Calapan south road K0018+000 - K0022+668.00, Naujan, Oriental Mindoro | Naujan | 2019 | Tapos na | ₱96,497,912 |
| Flood control · Brgy. Campaasan section Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of cawacat river (downstream), brgy. campaasan section, Bulalacao, Oriental Mindoro | Bulalacao | 2024 | Tapos na | ₱96,497,149 |
| Flood control · Brgy. Morente section Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of Bongabong river control, brgy. morente section, Bongabong, Oriental Mindoro | Bongabong | 2024 | Tapos na | ₱96,496,494 |
| Preventive maintenance · Calapan South Road Preventive maintenance along Calapan south rd (S00007MR) - K0044+575- K0045+198, Oriental Mindoro | – | 2025 | Tapos na | ₱96,496,186 |
| Special road fund- motor vehicle user's charge (mvuc) as per R.A. 11239- installation of road safety devices (guardrails, solar studs & chevron signs) along Calapan north rd. & CSR jct. Pola rd., cnr K0021+000-K0061+000; CSR jct. Pola K0068+000-K0072+000, | Pola | 2023 | Tapos na | ₱96,495,139 |
| Construction of river control project at subaan river (phase III), San Teodoro, Oriental Mindoro, sta. 00+000.00-sta. 00+454.10 (bs) | San Teodoro | 2022 | Tapos na | ₱96,490,897 |
| Construction of flood control structure along pula river at barangay santo nino-pagalagala-santa maria and pambisan malaki, sta. 0+376.40-sta. 1+156.85,Oriental Mindoro | Socorro | 2021 | Tapos na | ₱96,490,000 |
| Asphalt overlay · Calapan South Road Asphalt overlay along Calapan south road K0006+600 - K0009+520, K0048+480 - K0050+750, Calapan city & Socorro, Oriental Mindoro | Socorro | 2019 | Tapos na | ₱96,472,160 |