Construction of missing links/new roads Bulalacao-san jose road (Bulalacao section), sta. 0+000-sta. 0+044.60; sta. 0+105.40-sta. 1+302; sta. 0+066.60-sta. 0+105.40, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱96,498,930

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2021
Katayuan
Tapos na
Kategorya
Bridges, Roads
Contractor
SIXTEEN ENTERPRISES-CALAPAN BRANCH
Simula
Aug 26, 2021
Katapusan
Dec 17, 2022
TAGAL
478 araw
ID ng proyekto
21E00036

ORAS

Timeline

Simula

Aug 26, 2021

478 araw mula simula

Katapusan

Dec 17, 2022

LOKASYON

Nasaan ito

Coordinates: 12.35766, 121.26093

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF MISSING LINKS/NEW ROADS BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), STA. 0+000-STA. 0+044.60; STA. 0+105.40-STA. 1+302; STA. 0+066.60-STA. 0+105.40, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.