Skip to content

Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of flood control structure along cavillan river upstream, Bulalacao, or. Mindoro

Tapos na

PUBLISHED NA BUDGET

₱202,647,244

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2023
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
Simula
Apr 13, 2023
Katapusan
Dec 10, 2023
TAGAL
241 araw
ID ng proyekto
23E00204

ORAS

Timeline

Simula

Apr 13, 2023

241 araw mula simula

Katapusan

Dec 10, 2023

LOKASYON

Nasaan ito

Coordinates: 12.38473, 121.35220

DETALYE

Detalye ng proyekto

Orihinal na pamagat
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG CAVILLAN RIVER UPSTREAM, BULALACAO, OR. MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.