Skip to content

Const. of missing links/new roads-Bulalacao-san jose road (Bulalacao section); road: sta. 1+336-sta. 2+706; sta. 2+905-sta. 3+455; bridge 1: sta. 1+302-sta. 1+332; bridge 2: sta. 2+710-sta. 2+735, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱82,988,313

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2022
Katayuan
Tapos na
Kategorya
Bridges, Roads
Contractor
MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
Simula
Mar 24, 2022
Katapusan
May 27, 2023
TAGAL
429 araw
ID ng proyekto
22E00058

ORAS

Timeline

Simula

Mar 24, 2022

429 araw mula simula

Katapusan

May 27, 2023

LOKASYON

Nasaan ito

Coordinates: 12.37357, 121.24589

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONST. OF MISSING LINKS/NEW ROADS-BULALACAO-SAN JOSE ROAD (BULALACAO SECTION); ROAD: STA. 1+336-STA. 2+706; STA. 2+905-STA. 3+455; BRIDGE 1: STA. 1+302-STA. 1+332; BRIDGE 2: STA. 2+710-STA. 2+735, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.