Skip to content

Construction of flood control structure along pula river at barangay santo nino-pagalagala-santa maria and pambisan malaki, sta. 0+376.40-sta. 1+156.85,Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱96,490,000

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2021
Bayan
Socorro
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
E E CONSTRUCTION (45017) / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
Simula
May 27, 2021
Katapusan
Apr 6, 2022
TAGAL
314 araw
ID ng proyekto
21E00037

ORAS

Timeline

Simula

May 27, 2021

314 araw mula simula

Katapusan

Apr 6, 2022

LOKASYON

Nasaan ito

Coordinates: 13.04826, 121.42003

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULA RIVER AT BARANGAY SANTO NINO-PAGALAGALA-SANTA MARIA AND PAMBISAN MALAKI, STA. 0+376.40-STA. 1+156.85,ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.