Construction of pula river control structure, Socorro, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱23,507,024
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2018
- Bayan
- Socorro
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- FRAMECON BUILDERS
- Simula
- Mar 18, 2018
- Katapusan
- Sep 12, 2018
- TAGAL
- 178 araw
- ID ng proyekto
- 18ED0060
ORAS
Timeline
Simula
Mar 18, 2018
178 araw mula simula
Katapusan
Sep 12, 2018
LOKASYON
Nasaan ito
Coordinates: 13.04970, 121.42464
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF PULA RIVER CONTROL STRUCTURE, SOCORRO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of flood control structure along pula river at barangay santo nino-pagalagala-santa maria and pambisan malaki, sta. 0+376.40-sta. 1+156.85,Oriental Mindoro
Tapos naSocorro2021
₱96.5 M
published na budgetConstruction of pula river control, Socorro, Oriental Mindoro
Tapos naSocorro2024
₱62.7 M
published na budgetConstruction of flood control in so lapog, sto. domingo, Socorro, Oriental Mindoro
Tapos naSocorro2023
₱30.8 M
published na budgetRehabilitation/reconstruction of subaan river control, Socorro, Oriental Mindoro
Tapos naSocorro2022
₱13.9 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.