PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
152
ayon sa napiling filter
PUBLISHED NA BUDGET
₱3.07 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
94%
143 sa 152 proyektong may katayuan
LOKASYON
152 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along caratao river, Bulalacao, or. Mindoro | 2023 | ₱209,482,311 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of flood control structure along cavillan river upstream, Bulalacao, or. Mindoro | 2023 | ₱202,647,244 |
| Rehab/reconst/upgrading of mooecr K00188+398-K00188-928; K00190+000-K00190+428; K00193+299-K00193+59 | 2016 | ₱185,471,097 |
| Road widening of Calapan south road, KO168+404-KO169+104; KO170+879-KO171+846; KO172+116-KO173+220; KO173+415-KO174+132; KO174+496-KO175+057; KO178+300-KO178+367; KO178+559-KO180+727, Bulalacao, Oriental Mindoro | 2020 | ₱144,749,908 |
| Network development program- const. of missing links/new roads- Bulalacao-san jose road (Bulalacao section), Oriental Mindoro | 2023 | ₱135,097,852 |
| Sustainable infrastructure projects alleviating gaps (sipag) coastal roads/causeway for environmental protection/conservation- construction of maujao shore protection & causeway development, Bulalacao, Oriental Mindoro | 2023 | ₱116,298,370 |
| Preventive maintenance-secondary roads-Mindoro oriental/occidental east coastal road, KO183+780-KO184+722; KO185+000-KO185+282; KO187+537-KO188+000; KO193+946-KO194+607; KO195+086-KO195+412, Bulalacao, Oriental Mindoro | 2023 | ₱101,320,421 |
| Construction of Bulalacao public market, Bulalacao, Oriental Mindoro | 2022 | ₱96,499,909 |
| Construction of missing links/new roads Bulalacao-san jose road (Bulalacao section), sta. 0+000-sta. 0+044.60; sta. 0+105.40-sta. 1+302; sta. 0+066.60-sta. 0+105.40, Oriental Mindoro | 2021 | ₱96,498,930 |
| Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of cawacat river (downstream), brgy. campaasan section, Bulalacao, Oriental Mindoro | 2024 | ₱96,497,149 |
Ipinapakita ang 21–30 sa 152, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Concreting of sta. rosa - suryawon - lagnas access road, brgy. sta. rosa, Bulalacao, Oriental Mindoro | Bulalacao | 2020 | Tapos na | ₱29,698,571 |
| Concreting of Bulalacao diversion road phase II, campaasan section, Bulalacao, Oriental Mindoro | Bulalacao | 2021 | Tapos na | ₱29,399,782 |
| Flood control · Brgy. Nasuk Sustainable infrastructure projects alleviating gaps (sipag) - flood mitigation structures protecting public infrastructures/facilities - construction of cavillan river waterway enhancement structure (nasukob section), along sitio cavillan, barangay nasuk | Bulalacao | 2024 | Tapos na | ₱29,397,113 |
| Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of river control structure along cawacat river, cambunang section, Bulalacao, Oriental Mindoro | Bulalacao | 2024 | Tapos na | ₱29,396,725 |
| Flood control · Brgy. Campaasan Construction/maintenance of flood mitigation structures and drainage systems, construction of cawacat river control structure (upstream), barangay campaasan, Bulalacao, Oriental Mindoro | Bulalacao | 2025 | Tapos na | ₱29,229,813 |
| Flood control · Brgy. Nasucob Construction/maintenance of flood mitigation structures and drainage systems, construction of coringot river control structure (coringot bridge abutment a and b upstream), barangay nasucob, Bulalacao, Oriental Mindoro | Bulalacao | 2025 | Isinasagawa | ₱29,095,388 |
| Rehab./reconst. of national roads, mooecr (KO194+000-KO195+000), Bulalacao, Oriental Mindoro | Bulalacao | 2017 | Tapos na | ₱28,899,243 |
| Construction of flood mitigation structures and drainage systems, construction of cavillian river control structures, Bulalacao, Oriental Mindoro | Bulalacao | 2018 | Tapos na | ₱28,215,017 |
| Asphalt overlay @ Calapan south road, K0171+000 - K0171+845, K0172+092 - K0172+700, K0173+000 - K0173+370, Bulalacao, Oriental Mindoro | Bulalacao | 2017 | Tapos na | ₱27,899,336 |
| Rehabilitation/ reconstruction of roads with slips, slope collapse and landslide - tertiary roads - Calapan south rd - K0187+690 - K0187+934.80, Bulalacao, Oriental Mindoro | Bulalacao | 2022 | Tapos na | ₱26,928,181 |