Skip to content

Flood control · Brgy. Nasucob

Construction/maintenance of flood mitigation structures and drainage systems, construction of coringot river control structure (coringot bridge abutment a and b upstream), barangay nasucob, Bulalacao, Oriental Mindoro

Isinasagawa

PUBLISHED NA BUDGET

₱29,095,388

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2025
Katayuan
Isinasagawa
Kategorya
Flood Control and Drainage
Contractor
D.M. MALIWANAG BUILDERS AND ENTERPRISES
Simula
Mar 11, 2025
Katapusan
-
TAGAL
-
ID ng proyekto
25EI0019

ORAS

Timeline

- Walang petsa sa dokumento. Walang petsa ng simula at katapusan.

LOKASYON

Nasaan ito

Coordinates: 12.35210, 121.34002

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CORINGOT RIVER CONTROL STRUCTURE (CORINGOT BRIDGE ABUTMENT A AND B UPSTREAM), BARANGAY NASUCOB, BULALACAO, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.