Skip to content

Construction of flood mitigation structures and drainage systems, construction of cavillian river control structures, Bulalacao, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱28,215,017

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2018
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
Simula
Apr 24, 2018
Katapusan
Jan 15, 2019
TAGAL
266 araw
ID ng proyekto
18EI0054

ORAS

Timeline

Simula

Apr 24, 2018

266 araw mula simula

Katapusan

Jan 15, 2019

LOKASYON

Nasaan ito

Coordinates: 12.38459, 121.35292

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CAVILLIAN RIVER CONTROL STRUCTURES, BULALACAO, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.