PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
229
ayon sa napiling filter
PUBLISHED NA BUDGET
₱5.26 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
88%
201 sa 229 proyektong may katayuan
LOKASYON
229 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Flood management program- const./rehab. of flood mitigation facilities within river basins and principal rivers- const. of flood control structure, Bongabong river, brgy. lisap-brgy. batangan (upstream), sta. 000+330-sta. 000+649.50, Bongabong, or. mindor | 2025 | ₱231,473,802 |
| Flood management program- const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure, Bongabong river, brgy. lisap-brgy. batangan (downstream), sta. 000+680-sta. 000+995.85, Bongabong, o. | 2025 | ₱231,114,686 |
| Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bongabong river, Bongabong, or. Mindoro | 2025 | ₱229,928,160 |
| Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bongabong river upstream, Bongabong, or. Mindoro | 2025 | ₱229,798,744 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along Bongabong river, anilao-mina de oro sect., Bongabong, r. Mindoro | 2023 | ₱217,123,307 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along Bongabong river, morente-lisap section, Bongabong, or. Mindoro | 2023 | ₱217,123,082 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along Bongabong river, san isidro-san jose section, Bongabong, or. Mindoro | 2023 | ₱217,122,960 |
| Sustainable infrastructure projects alleviating gaps (sipag) coastal roads/causeway for environmental protection/conservation- const. of southern Mindoro coastal road, Bongabong, Oriental Mindoro | 2023 | ₱200,067,599 |
| Cluster 7: lip- construction of slope protection along Calapan south road, KO0118+080-KO0118+208; KO0118+240-KO0118+267; KO118+353-KO0118+460; KO0119+200-KO0119+287; KO0119+130-KO0119+190, Bongabong, or. Mindoro | 2021 | ₱197,999,545 |
| Flood management program- const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bongabong river, brgy. lisap, Bongabong, or. Mindoro | 2024 | ₱192,997,844 |
Ipinapakita ang 71–80 sa 229, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Concreting of brgy. san isidro, Bongabong, Oriental Mindoro | Bongabong | 2019 | Tapos na | ₱14,568,803 |
| Rehabilitation/reconstruction of roads with slips, slope collapse landslide - secondary roads - Calapan south rd - K0114+527.80 - K0114+563.00, K0114+600 - K0114+695.60, Bongabong, Oriental Mindoro | Bongabong | 2021 | Tapos na | ₱14,390,795 |
| Rehabilitation/reconstruction/upgrading of damaged paved roads - secondary roads, CSR (K0121+668 - K0122+015), Bongabong, Oriental Mindoro | Bongabong | 2020 | Tapos na | ₱14,209,993 |
| Flood control · Brgy. Hagan Construction/maintenance of flood mitigation structures and drainage system, construction of flood mitigation structure, brgy. hagan, sta. 0+000, sta. 0+112, Bongabong, Oriental Mindoro | Bongabong | 2022 | Tapos na | ₱13,984,346 |
| Rehabilitation/ reconstruction of roads with slips, slope collapse and landslide- secondary roads,CSR (K0119+080-K0119+114.80), Bongabong, Oriental Mindoro | Bongabong | 2020 | Tapos na | ₱13,582,399 |
| Rehabilitation/reconstruction of roads with slips, slope collapse and landslide secondary roads - Calapan south road K0119+530 K0119+629, Bongabong, Oriental Mindoro | Bongabong | 2023 | Tapos na | ₱12,094,167 |
| Rehabilitation · Calapan South Road Off - carriageway improvement - secondary roads along Calapan south road - K0120+201 - K0121+334, Bongabong, Oriental Mindoro | Bongabong | 2020 | Tapos na | ₱12,054,000 |
| Concreting of morente - batangan fmr, brgy. morente and batangan, Bongabong, Oriental Mindoro | Bongabong | 2021 | Tapos na | ₱11,517,173 |
| Rehabilitation · Calapan South Road Rehabilitation/reconstruction of damaged paved roads along Calapan south road, K0102+550 - K0103+000, Bongabong, Oriental Mindoro | Bongabong | 2018 | Tapos na | ₱11,464,674 |
| Construction · Brgy. Aplaya Construction of seawall at barangay aplaya, Bongabong, Oriental Mindoro | Bongabong | 2025 | Tapos na | ₱10,690,592 |