Rehabilitation/reconstruction/upgrading of damaged paved roads - secondary roads, CSR (K0121+668 - K0122+015), Bongabong, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱14,209,993
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2020
- Bayan
- Bongabong
- Katayuan
- Tapos na
- Kategorya
- Roads
- Contractor
- ORIENT STAR CONSTRUCTION, INC. (FORMERLY: ORIENT S
- Simula
- Dec 11, 2020
- Katapusan
- Jun 13, 2021
- TAGAL
- 184 araw
- ID ng proyekto
- 20EI0100
ORAS
Timeline
Simula
Dec 11, 2020
184 araw mula simula
Katapusan
Jun 13, 2021
LOKASYON
Nasaan ito
Coordinates: 12.69731, 121.36742
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CSR (K0121+668 - K0122+015), BONGABONG, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Slope protection · Calapan South Road
Tapos naBongabong2021
Cluster 7: lip- construction of slope protection along Calapan south road, KO0118+080-KO0118+208; KO0118+240-KO0118+267; KO118+353-KO0118+460; KO0119+200-KO0119+287; KO0119+130-KO0119+190, Bongabong, or. Mindoro
₱198.0 M
published na budgetPreventive maintenance - secondary roads - Calapan south road - K0098+195 - K0099+447, Bongabong, Oriental Mindoro
Tapos naBongabong2023
₱77.5 M
published na budgetRoad widening - secondary roads - Calapan south road K0111+459 - K0113+000, Bongabong, Oriental Mindoro
Tapos naBongabong2023
₱57.8 M
published na budgetRoad widening along Calapan south road, K0100+400 - K0102+050, Bongabong , Oriental Mindoro
Tapos naBongabong2018
₱48.2 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.