Skip to content

Slope protection · Calapan South Road

Cluster 7: lip- construction of slope protection along Calapan south road, KO0118+080-KO0118+208; KO0118+240-KO0118+267; KO118+353-KO0118+460; KO0119+200-KO0119+287; KO0119+130-KO0119+190, Bongabong, or. Mindoro

Tapos na

PUBLISHED NA BUDGET

₱197,999,545

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2021
Katayuan
Tapos na
Kategorya
Roads
Contractor
ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / STX ENTERPRISES
Simula
Jun 24, 2022
Katapusan
Dec 29, 2022
TAGAL
188 araw
ID ng proyekto
21E00097

ORAS

Timeline

Simula

Jun 24, 2022

188 araw mula simula

Katapusan

Dec 29, 2022

LOKASYON

Nasaan ito

Coordinates: 12.71297, 121.38228

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CLUSTER 7: LIP- CONSTRUCTION OF SLOPE PROTECTION ALONG CALAPAN SOUTH ROAD, KO0118+080-KO0118+208; KO0118+240-KO0118+267; KO118+353-KO0118+460; KO0119+200-KO0119+287; KO0119+130-KO0119+190, BONGABONG, OR. MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.