Rehabilitation · Brgy. Loyal
Rehabilitation of road, junction poblacion - barangay loyal, Victoria,Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱96,499,652
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2025
- Bayan
- Victoria
- Katayuan
- Tapos na
- Kategorya
- GAA 2025 SSP
- Contractor
- MG SAMIDAN CONSTRUCTION
- Simula
- Mar 19, 2025
- Katapusan
- Sep 5, 2025
- TAGAL
- 170 araw
- ID ng proyekto
- 25ED0149
ORAS
Timeline
Simula
Mar 19, 2025
170 araw mula simula
Katapusan
Sep 5, 2025
LOKASYON
Nasaan ito
Coordinates: 13.17586, 121.27718
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- REHABILITATION OF ROAD, JUNCTION POBLACION - BARANGAY LOYAL, VICTORIA,ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction · Brgy. Canaan
Tapos naVictoria2025
Construction of multi - purpose building (senior citizen building with rainwater harvester tank) in zone 1, barangay canaan, Victoria, Oriental Mindoro
₱4.8 M
published na budgetConst. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro
Tapos naVictoria20182 bahagi ng daan
₱237.3 M
published na budgetBridge program- alcate bridge (B00027MR) along CSR jct.-minas road sta. 000+000.00-sta. 000+330.00, Victoria, Oriental Mindoro
IsinasagawaVictoria2025
₱217.0 M
published na budgetAsphalt overlay · Calapan South Road
Tapos naVictoria20243 bahagi ng daan
Asphalt overlay along Calapan south road - K0040+000 - K0040+583, K0040+583 - K0041+250, K0044+321 -K0044+575, Victoria, Oriental Mindoro
₱117.7 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.