Construction of flood control structure along pula river, Socorro, Oriental Mindoro
Para sa procurement
PUBLISHED NA BUDGET
₱0
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2025
- Bayan
- Socorro
- Katayuan
- Para sa procurement
- Kategorya
- Flood Control and Drainage
- Contractor
- -
- Simula
- -
- Katapusan
- -
- TAGAL
- -
- ID ng proyekto
- 25ED0107
ORAS
Timeline
- Walang petsa sa dokumento. Walang petsa ng simula at katapusan.
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULA RIVER, SOCORRO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of flood control structure along pula river at barangay santo nino-pagalagala-santa maria and pambisan malaki, sta. 0+376.40-sta. 1+156.85,Oriental Mindoro
Tapos naSocorro2021
₱96.5 M
published na budgetConstruction of pula river control, Socorro, Oriental Mindoro
Tapos naSocorro2024
₱62.7 M
published na budgetConstruction of flood control in so lapog, sto. domingo, Socorro, Oriental Mindoro
Tapos naSocorro2023
₱30.8 M
published na budgetConstruction of pula river control structure, Socorro, Oriental Mindoro
Tapos naSocorro2018
₱23.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.