Construction of central school drainage canal, zone IV, Socorro, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱9,900,000
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2020
- Bayan
- Socorro
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)
- Simula
- Nov 30, 2020
- Katapusan
- Mar 31, 2021
- TAGAL
- 121 araw
- ID ng proyekto
- 20ED0078
ORAS
Timeline
Simula
Nov 30, 2020
121 araw mula simula
Katapusan
Mar 31, 2021
LOKASYON
Nasaan ito
Coordinates: 13.05861, 121.40455
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF CENTRAL SCHOOL DRAINAGE CANAL, ZONE IV, SOCORRO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of flood control structure along pula river at barangay santo nino-pagalagala-santa maria and pambisan malaki, sta. 0+376.40-sta. 1+156.85,Oriental Mindoro
Tapos naSocorro2021
₱96.5 M
published na budgetConstruction of pula river control, Socorro, Oriental Mindoro
Tapos naSocorro2024
₱62.7 M
published na budgetConstruction of flood control in so lapog, sto. domingo, Socorro, Oriental Mindoro
Tapos naSocorro2023
₱30.8 M
published na budgetConstruction of pula river control structure, Socorro, Oriental Mindoro
Tapos naSocorro2018
₱23.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.