Skip to content

Bridge · Calapan North Road

Cluster III: 1.) retrofitting/ strenghtening of san rafael bridge (B00184MR) along Calapan north road, San Teodoro, Oriental Mindoro 2.) retrofitting/strenghtening of subaan bridge (B00020MR) along Calapan south road, Socorro, Oriental Mindoro 3.) rehabil

Tapos naHindi tiyak ang bayan

PUBLISHED NA BUDGET

₱46,895,080

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2018
Bayan
Hindi tiyak ang bayan
Katayuan
Tapos na
Kategorya
Bridges
Contractor
ALPHATEC CHEMICAL CORPORATION (39938) / AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION
Simula
Mar 15, 2018
Katapusan
Jun 30, 2018
TAGAL
107 araw
ID ng proyekto
18ED0047

ORAS

Timeline

Simula

Mar 15, 2018

107 araw mula simula

Katapusan

Jun 30, 2018

LOKASYON

Nasaan ito

Coordinates: 13.44458, 121.00104

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CLUSTER III: 1.) RETROFITTING/ STRENGHTENING OF SAN RAFAEL BRIDGE (B00184MR) ALONG CALAPAN NORTH ROAD, SAN TEODORO, ORIENTAL MINDORO 2.) RETROFITTING/STRENGHTENING OF SUBAAN BRIDGE (B00020MR) ALONG CALAPAN SOUTH ROAD, SOCORRO, ORIENTAL MINDORO 3.) REHABIL

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.