Construction of flood control dike at pula river, sta. 0+000 - sta. 0+522 u/s; sta. 0+000 - sta. 0+538 d/s, Socorro, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱9,243,689
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2017
- Bayan
- Socorro
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- ETVR TRADING & CONSTRUCTION
- Simula
- Sep 10, 2017
- Katapusan
- Mar 28, 2018
- TAGAL
- 199 araw
- ID ng proyekto
- 17ED0127
ORAS
Timeline
Simula
Sep 10, 2017
199 araw mula simula
Katapusan
Mar 28, 2018
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF FLOOD CONTROL DIKE AT PULA RIVER, STA. 0+000 - STA. 0+522 U/S; STA. 0+000 - STA. 0+538 D/S, SOCORRO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of flood control structure along pula river at barangay santo nino-pagalagala-santa maria and pambisan malaki, sta. 0+376.40-sta. 1+156.85,Oriental Mindoro
Tapos naSocorro2021
₱96.5 M
published na budgetConstruction of pula river control, Socorro, Oriental Mindoro
Tapos naSocorro2024
₱62.7 M
published na budgetConstruction of flood control in so lapog, sto. domingo, Socorro, Oriental Mindoro
Tapos naSocorro2023
₱30.8 M
published na budgetConstruction of pula river control structure, Socorro, Oriental Mindoro
Tapos naSocorro2018
₱23.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.