Replacement of permanent weak bridge: ipil br. (B00201MR) along Bongabong-sagana-Roxas-san aquilino
Tapos naHindi tiyak ang bayan
PUBLISHED NA BUDGET
₱27,762,239
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2016
- Bayan
- Hindi tiyak ang bayan
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- SIXTEEN ENTERPRISES-CALAPAN BRANCH
- Simula
- Feb 28, 2016
- Katapusan
- Mar 1, 2018
- TAGAL
- 732 araw
- ID ng proyekto
- 16EI0002
ORAS
Timeline
Simula
Feb 28, 2016
732 araw mula simula
Katapusan
Mar 1, 2018
LOKASYON
Nasaan ito
Coordinates: 12.74149, 121.48678
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- REPLACEMENT OF PERMANENT WEAK BRIDGE: IPIL BR. (B00201MR) ALONG BONGABONG-SAGANA-ROXAS-SAN AQUILINO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Const. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro
Tapos naVictoria20182 bahagi ng daan
₱237.3 M
published na budgetBridge program- alcate bridge (B00027MR) along CSR jct.-minas road sta. 000+000.00-sta. 000+330.00, Victoria, Oriental Mindoro
IsinasagawaVictoria2025
₱217.0 M
published na budgetBridge · Calapan North Road
Tapos naHindi tiyak ang bayan2023
Replacement of permanent weak bridges- alag malaki bridge (B00181MR) along Calapan north road, Oriental Mindoro
₱202.6 M
published na budgetBridge program- widening of bridge- orconuma br. (B00217MR) along Bongabong-sagana-Roxas-san aquilino road, Bongabong, or. Mindoro
IsinasagawaBongabong2024
₱156.9 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.