Skip to content
Pinamalayan

BARANGAY

Sta. Maria

Barangay sa Pinamalayan · Oriental Mindoro

Lawak ng lupa

1.9

Kilometro kuwadrado

Bahagi ng bayan

1.4%

Ng lawak ng lupa ng bayan

Ihinahambing ng bar sa pinakamalaking bayan

Mga proyekto ng DPWH

4

Binanggit sa pamagat, o nakalagay ayon sa GPS point

Halaga ng proyekto

₱74.84M

Kabuuan ng mga proyektong nakalagay dito

Saan ito sa bayan

Mapa ng bayan na may highlight ang barangay na ito. Ang mga tuldok ay mga proyektong ng DPWH na nakalagay dito.

AnolingBacunganBangbangBaniladBuliCacawanCalingagDelrazonGuinhawaInclanayLumambayanMalayaMaliangcogManingcolMarayosMarfranciscoNabuslotPagalagalaPalayanPambisan MalakiPambisan MuntiPanggulayanPapandayanPiliQuinabiganRanzoRosarioSabangSta. IsabelSta. RitaSto. NiñoWawaZone I (Pob.)Zone II (Pob.)Zone III (Pob.)Zone IV (Pob.)

Pinakamalalaking proyekto rito

Nakalista rito ang proyekto kapag binanggit ng pamagat ang barangay na ito (maaaring bumanggit ng marami ang isang kalsada), o kung walang binanggit ang pamagat, kapag nasa loob nito ang GPS point ng DPWH. Isang point lang ang ibinibigay ng DPWH sa kalsada, na maaaring nasa kalapit na barangay, kaya mas inuuna ang pamagat. May mga proyektong walang alinman, kaya maaaring kulang ang listahang ito.

Lahat ng proyekto ng bayan →

Mga proyektong pinondohan ng bayan na ininspeksyon dito

  • Tapos · 100%May natuklasan2021 General Fund-Loan

    Road Rehabilitation / Sitio Ramos, Pagalagala to Sitio Santol, Sta. Maria Road

    FEAJ Construction and General Services · ₱11.36M

    PagalagalaSta. Maria

    1. Nov 23, 2021 · 67%
    2. Dec 9, 2021 · 100%
    Pinakabagong natuklasan at rekomendasyon (Dec 9, 2021)
    • Natuklasan100% (COMPLETED WITH FINDINGS)
    • NatuklasanPCCP blocks with transverse cracking acting as weakened plane joints
    • NatuklasanPCCP block with pockmarks
    • NatuklasanPCCP blocks with transverse cracking within 1.5 meters from weakened plane joints
    • NatuklasanUnsuitable materials used as road shoulder
    • Payo100% (COMPLETED WITH FINDINGS)
    • PayoRemove unsuitable materials that were used as road shoulder
    • PayoCompact properly the loose part of road shoulder
    • PayoRemove and replace 1/3 of the affected PCCP blocks transverse cracking within 1.5 meters from weakened
    • PayoSeal with concrete epoxy the affected PCCP block with pockmarks
    • PayoApply asphalt joint filler/sealant to the affected PCCP blocks with transverse cracking acting as weakened

    Mga dokumento ng bidding ng bayan:ITB ↗RFQ ↗NOA ↗

Mga opisyal ng barangay

  • Punong Barangay

    Jesus L. Marciano

  • Kagawad

    Marina A. Atienza

  • Kagawad

    Victor F. Cruzado

  • Kagawad

    Fredinel M. Wamil

  • Kagawad

    Eden G. Watiwat

  • Kagawad

    Josenilo B. Sapungan

  • Kagawad

    Edgar L. Mahaguay

  • Kagawad

    Gina D. Acedillo

  • SK Chairman

    John Patrick B. Landoy

  • Secretary

    Mrs. Ginalyn M. Linaza

  • Treasurer

    Mrs. Jocelyn O. Manguera

Ayon sa sariling website ng barangay, binasa noong 2026-11-12. Maaaring hindi pa ito naia-update ng barangay. Buksan ang website ng barangay ↗

Mga hangganan: BetterGov dataset 23 (PSGC, MIT). Mga proyekto: DPWH.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.