BARANGAY
Papandayan
Barangay sa Pinamalayan · Oriental Mindoro
Lawak ng lupa
5.56
Kilometro kuwadrado
Bahagi ng bayan
4.0%
Ng lawak ng lupa ng bayan
Ihinahambing ng bar sa pinakamalaking bayan
Mga proyekto ng DPWH
9
Binanggit sa pamagat, o nakalagay ayon sa GPS point
Halaga ng proyekto
₱179.16M
Kabuuan ng mga proyektong nakalagay dito
Saan ito sa bayan
Mapa ng bayan na may highlight ang barangay na ito. Ang mga tuldok ay mga proyektong ng DPWH na nakalagay dito.
Pinakamalalaking proyekto rito
Concreting of road at Pinamalayan, Oriental Mindoro
Tapos naPinamalayan2021
₱72.4 M
Construction of Oriental Mindoro central district hospital, Pinamalayan, Oriental Mindoro
IsinasagawaPinamalayan2025
₱63.1 M
Bridge · Calapan South Road
Tapos naPinamalayan2020
Widening of permanent bridges, papandayan br., (B00207MR) along Calapan south road, Pinamalayan, Oriental Mindoro
₱12.5 M
Bridge · Calapan South Road
Tapos naPinamalayan2020
Widening of permanent bridges, matuod - tuod br., (B00206MR) along Calapan south road, Pinamalayan, Oriental Mindoro
₱12.5 M
Construction of papandayan-rosario road, barangay papandayan-rosario, Pinamalayan, Oriental Mindoro
Tapos naPinamalayan2022
₱9.6 M
Construction · Brgy. Papandayan
Tapos naPinamalayan2022
Construction of road at barangay papandayan, Pinamalayan, Oriental Mindoro
₱4.9 M
Concreting of brgy. papandayan and brgy. bangbang road, Pinamalayan, Oriental Mindoro
Tapos naPinamalayan2018
₱1.9 M
Installation/application of signage, pavement markings along Calapan south rd - K0072+000 - K0074+000, Pinamalayan, Oriental Mindoro
Tapos naPinamalayan2024
₱1.2 M
Installation/application of road safety facilities (roadway lighting) along Calapan south rd - K0072+721.00 - K0073+716.00, Pinamalayan, Oriental Mindoro
Tapos naPinamalayan2025
₱894,722
Nakalista rito ang proyekto kapag binanggit ng pamagat ang barangay na ito (maaaring bumanggit ng marami ang isang kalsada), o kung walang binanggit ang pamagat, kapag nasa loob nito ang GPS point ng DPWH. Isang point lang ang ibinibigay ng DPWH sa kalsada, na maaaring nasa kalapit na barangay, kaya mas inuuna ang pamagat. May mga proyektong walang alinman, kaya maaaring kulang ang listahang ito.
Lahat ng proyekto ng bayan →Mga proyektong pinondohan ng bayan na ininspeksyon dito
- Isinasagawa · 82%2023 20% DF
Construction of Elevated Water Tank - Barangay Papandayan
Innovative Mangyan Builders · ₱1.46M
Papandayan
- Mar 13, 2024 · 50%
- Mar 26, 2024 · 80%
- Mar 26, 2024 · 82%
- Tapos · 100%May natuklasan2023 20% Development Fund
Construction of Three Classroom Building (Dr. Aristeo V. Baldos, Sr Papandayan High School) - Barangay Papandayan
Martinez Enterprises · ₱4.50M
Papandayan
- Jun 29, 2023 · 5%
- Jul 25, 2023 · 30%
- Sep 28, 2023 · 60%
- Nov 16, 2023 · 88%
- Dec 20, 2023 · 100%
- Mar 13, 2024 · 100%
Pinakabagong natuklasan at rekomendasyon (Mar 13, 2024)
- Natuklasan100.00% (COMPLETED as to dimension with FINDINGS)
- NatuklasanWater leak in the gutter
- NatuklasanUnfinished tile setting in the 3comfort rooms
- NatuklasanDamaged door knobs and
- NatuklasanExcessive Gaps in the middle of the doors
- Payo100.00% (COMPLETED as to dimension with FINDINGS)
- PayoRepair the water leak in the gutter
- PayoFinish the tile setting in the 3 comfort rooms
- PayoReplace the damaged doorknobs and
- Tapos · 100%May natuklasan2022 Special Education Fund
Construction of Isolation Room - Papandayan Elementary School
By Administration · ₱386,690
Papandayan
- Sep 28, 2023 · 100%
Pinakabagong natuklasan at rekomendasyon (Sep 28, 2023)
- Natuklasan100.00% (Completed as to dimension with Findings)
- NatuklasanWrong positioning of steel trusses
- NatuklasanFabrication of steel trusses and fascia cover are not good
- NatuklasanSag Rod are not properly placed in purlins
- NatuklasanUse of substandard materials
- Payo100.00% (Completed as to dimension with Findings)
- PayoApplication of adequate rust remover and rust converter into corroded steel trusses.
- PayoSteel trusses must be aligned or atop at the roof beam
- PayoRepair/replace the fascia cover
Mga dokumento ng bidding ng bayan:ITB ↗
- Tapos · 100%May natuklasanFund Source! 2021 General Fund-Loan
Road Rehabilitation/Maningcol-Papandayan Road
Orient Star Construction Inc. · ₱22.80M
ManingcolPapandayan
- Sep 16, 2021 · 2%
- Dec 9, 2021 · 30.01%
- Feb 22, 2022 · 51%
- Apr 21, 2022 · 74%
- May 5, 2022 · 80%
- Jun 2, 2022 · 90%
- Jul 29, 2022 · 100%
- Aug 23, 2022 · 100%
Pinakabagong natuklasan at rekomendasyon (Aug 23, 2022)
- Natuklasan100.00% (COMPLETED WITH FINDINGS)
- NatuklasanPCCP bilocks with transverse cracking acting as weakened plane joints
- NatuklasanPCCP blocks with transverse cracking within 1.5 meters from weakened plane joints
- NatuklasanPCCP blocks with transverse cracking within the middle block
- NatuklasanPlastering works application instead of Remove and Replace Works for the PCCP blocks with transverse
- NatuklasanCracking within 1.5 meters from weakened plane joints
- Payo100.00% (COMPLETED WITH FINDINGS)
- PayoApply asphalt joint filler/sealant to the affected PCCP blocks with transverse cracking acting as weakened
- PayoRemove and replace 1/3 of the affected PCCP blocks transverse cracking within 1.5 meters from weakened
- PayoSeal with concrete epoxy the affected PCCP blocks with transverse cracking within middle block
- PayoApply Remove and Replace Works for the PCCP blocks with transverse cracking within 1.5 meters from
- PayoWeakened plane joints applied with plastering works
- PayoApply asphalt sealant to PCCP blocks with pockmarks
- Tapos · 100%2021 General Fund-Loan
Road Rehabilitation / Sitio Quezon, Papandayan Road
Orient Star Construction Inc. · ₱16.80M
Papandayan
- Sep 16, 2021 · 2%
- Dec 9, 2021 · 30.03%
- Feb 2, 2022 · 60%
- Mar 8, 2022 · 92%
- May 5, 2022 · 100%
- Jun 2, 2022 · 100%
- Tapos · 100%2021 Special Education Fund
Construction of School Classroom Building/Papandayan High School Barangay Papandayan
Contractor Malagong Bie Construction · ₱998,280
Papandayan
- Apr 21, 2022 · 100%
- Tapos · 100%2021 General Fund-Loan
Road Rehabilitation/Papandayan-Rosario Boundary to Rosario Elementary School
Delrol Enterprises · ₱10.00M
PapandayanRosario
- Sep 16, 2021 · 51%
- Oct 26, 2021 · 90.09%
- Nov 23, 2021 · 100%
- Mar 8, 2022 · 100%
- Tapos · 100%2021 LGSF-DRRAP
Construction of Multi-Purpose Hall Roofing and Steel Trusses I Papandayan Elementary School
Green Island Enterprises · ₱2.00M
Papandayan
- Nov 23, 2021 · 100%
Mga dokumento ng bidding ng bayan:ITB ↗
- Tapos · 100%2021 LGSF-DRRAP
Rehabilitation of Slaughterhouse/Papandayan
By Administration · ₱500,000
Papandayan
- Aug 19, 2021 · 100%
Pinakabagong natuklasan at rekomendasyon (Aug 19, 2021)
- Natuklasan1.The Replacement of Roofing and C-Purlins was located to the left side of the Holding Pen Area according to
- NatuklasanThe Roof Framing Plan of the Program of Works, however, the actual replacement took place at the right side.
- Natuklasan2. No Replacement of Roofing and C-Purlins at the Boiler Area at the right side of the Slaughterhouse was
- Natuklasan3. Only roofing was replaced at the right center of the Slaughterhouse was observed. Old c-purlins were used.
- PayoExplanation of the deviation of the the original plan and the non-observance of some replacement works of the
Mga opisyal ng barangay
Punong Barangay
Raul M. Miciano
Kagawad
Elvin L. Villamarin
Kagawad
Jayson S. Sadicon
Kagawad
Michael S. Julao
Kagawad
Gil Z. De Mesa
Kagawad
Reynaldo L. Caringal
Kagawad
Arnold S. Magbanua
Kagawad
Limuel G. Colorado
SK Chairman
Jan Edreyel L. Hernandez
Secretary
Shella May L. Lamboloto
Treasurer
Crisanto G. Sapurna
Ayon sa sariling website ng barangay, binasa noong 2026-11-12. Maaaring hindi pa ito naia-update ng barangay. Buksan ang website ng barangay ↗
Mga hangganan: BetterGov dataset 23 (PSGC, MIT). Mga proyekto: DPWH.