Mga proyekto ng DPWH
4
Binanggit sa pamagat, o nakalagay ayon sa GPS point
Halaga ng proyekto
₱102.70M
Kabuuan ng mga proyektong nakalagay dito
Saan ito sa bayan
Mapa ng bayan na may highlight ang barangay na ito. Ang mga tuldok ay mga proyektong ng DPWH na nakalagay dito.
Pinakamalalaking proyekto rito
Flood control · Brgy. Pagalagala section
Tapos naPinamalayan20222 bahagi ng daan
Construction/rehabilitation of flood mitigation facilities within major river basins and principal river, construction of pula river control, brgy. pagalagala section, sta. 0+000 - sta. 0+480 and sta. 0+000 - sta. 0+086, Pinamalayan, Oriental Mindoro
₱49.0 M
Construction/maintenance of flood mitigation structures and drainage system, construction of pagalagala river control, Pinamalayan, Oriental Mindoro
Tapos naPinamalayan2020
₱49.0 M
Construction · Brgy. Pagalagala
Tapos naPinamalayan2019
Construction of multi - purpose building (covered court), barangay pagalagala, Pinamalayan, Oriental Mindoro
₱2.8 M
Construction · Brgy. Pagalagala
Tapos naPinamalayan2022
Construction of multi-purpose building in barangay pagalagala, Pinamalayan, Oriental Mindoro
₱1.9 M
Nakalista rito ang proyekto kapag binanggit ng pamagat ang barangay na ito (maaaring bumanggit ng marami ang isang kalsada), o kung walang binanggit ang pamagat, kapag nasa loob nito ang GPS point ng DPWH. Isang point lang ang ibinibigay ng DPWH sa kalsada, na maaaring nasa kalapit na barangay, kaya mas inuuna ang pamagat. May mga proyektong walang alinman, kaya maaaring kulang ang listahang ito.
Lahat ng proyekto ng bayan →Mga proyektong pinondohan ng bayan na ininspeksyon dito
- Tapos · 100%May natuklasan2021 General Fund-Loan
Road Rehabilitation / Sitio Ramos, Pagalagala to Sitio Santol, Sta. Maria Road
FEAJ Construction and General Services · ₱11.36M
PagalagalaSta. Maria
- Nov 23, 2021 · 67%
- Dec 9, 2021 · 100%
Pinakabagong natuklasan at rekomendasyon (Dec 9, 2021)
- Natuklasan100% (COMPLETED WITH FINDINGS)
- NatuklasanPCCP blocks with transverse cracking acting as weakened plane joints
- NatuklasanPCCP block with pockmarks
- NatuklasanPCCP blocks with transverse cracking within 1.5 meters from weakened plane joints
- NatuklasanUnsuitable materials used as road shoulder
- Payo100% (COMPLETED WITH FINDINGS)
- PayoRemove unsuitable materials that were used as road shoulder
- PayoCompact properly the loose part of road shoulder
- PayoRemove and replace 1/3 of the affected PCCP blocks transverse cracking within 1.5 meters from weakened
- PayoSeal with concrete epoxy the affected PCCP block with pockmarks
- PayoApply asphalt joint filler/sealant to the affected PCCP blocks with transverse cracking acting as weakened
Mga opisyal ng barangay
Punong Barangay
Dennis D. Ramos
Kagawad
Maribel L. Generalla
Kagawad
Mark Kevin M. Mercene
Kagawad
Roberto M. Delos Reyes Jr.
Kagawad
Joseph L. Labay
Kagawad
Noralyn P. Labog
Kagawad
Tricia Mae P. Ramos
Kagawad
Florentino Joel D. Landicho
SK Chairman
Kia Reine R. Limbo
Secretary
Imelda D. Selda
Treasurer
Benhur L. Manay
Ayon sa sariling website ng barangay, binasa noong 2026-11-12. Maaaring hindi pa ito naia-update ng barangay. Buksan ang website ng barangay ↗
Mga hangganan: BetterGov dataset 23 (PSGC, MIT). Mga proyekto: DPWH.