PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
270
ayon sa napiling filter
PUBLISHED NA BUDGET
₱12.02 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
94%
253 sa 270 proyektong may katayuan
LOKASYON
270 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike, bry. dulangan, pto. galera, Oriental Mindoro | 2023 | ₱247,496,508 |
| Basic infrasructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike along dulangan river, (paitan section), or. Mindoro | 2023 | ₱247,496,307 |
| Basic infrastucture program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/failities- const. of road dike along dulangan river, (metolza section), or. Mindoro | 2023 | ₱247,495,816 |
| Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike along dulangan river, (evangelista section), Oriental Mindoro | 2023 | ₱247,494,945 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities-const. of dike along dulangan river, sitio bayanan, Naujan, or. Mindoro | 2023 | ₱241,246,776 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastuctures/facilities- const. of dike along dulangan river, paitan section, Naujan, or. Mindoro | 2023 | ₱241,246,569 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastuctures/facilities- const. of dike along dulangan river, evangelista section, Naujan, or. Mindoro | 2023 | ₱241,246,196 |
| Sustainable infrastructure projects alleviating gaps (sipag)-flood mitigation structures protecting public infrastructures/facilities- const. of dike along dulangan river, sitio bagong buhay, Naujan, or. Mindoro | 2023 | ₱241,245,363 |
Ipinapakita ang 31–40 sa 270, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Construction of missing links/new roads Victoria-sablayan road (Mindoro cross island road), package II, Mindoro oriental | – | 2023 | Isinasagawa | ₱187,016,117 |
| Slope protection · Brgy. Anin Basic infrastructure program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of roads with slips, slope collapse and landslide at sitio talipanan, sta. 015+460-sta. 015+660 in brgy. anin | Puerto Galera | 2023 | Tapos na | ₱163,329,163 |
| Basic infrastructure program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of montemayor-masaguing-herrera road, Naujan, or. Mindoro | Naujan | 2023 | Tapos na | ₱147,999,060 |
| Flood control · Brgy. Arangin Construction of flood control structure along bagtu river at brgy. arangin, Oriental Mindoro | Naujan | 2023 | Tapos na | ₱144,749,988 |
| Network development program- const. of missing links/new roads- Bulalacao-san jose road (Bulalacao section), Oriental Mindoro | Bulalacao | 2023 | Tapos na | ₱135,097,852 |
| Sustainable infrastructure projects alleviating gaps (sipag) coastal roads/causeway for environmental protection/conservation- const. of Bongabong sore protection & causeway development, Bongabong, or. Mindoro | Bongabong | 2023 | Tapos na | ₱120,622,958 |
| Bridge · Brgy. Sta Sustainable infrastructure projects alleviating gaps (sipag)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road, brgy. sta. cruz provincial road, sitio centro, Baco, or. Mindoro | Baco | 2023 | Isinasagawa | ₱116,831,867 |
| Sustainable infrastructure projects alleviating gaps (sipag)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road, burbuli-lumangbayan rovincial road, Baco, or. Mindoro | Baco | 2023 | Isinasagawa | ₱116,829,897 |
| Bridge · Brgy. Sta Sustainable infrastructure projects alleviating gaps (sipag)- access roads and/or bridges from the national roads leading to major/strategic public buildings/facilities- const. of road, brgy. sta. cruz provincial road, sitio happy valley, Baco, or./ min | Baco | 2023 | Isinasagawa | ₱116,828,998 |
| Bridge · Brgy. Sta Sustainable infrastructure projects alleviating gaps (sipag)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road, brgy. sta. rosa II provincial road, sitio calamansian, Baco, or. min | – | 2023 | Isinasagawa | ₱116,826,919 |