Skip to content

Slope protection · Brgy. Anin

Basic infrastructure program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of roads with slips, slope collapse and landslide at sitio talipanan, sta. 015+460-sta. 015+660 in brgy. anin

Tapos na

PUBLISHED NA BUDGET

₱163,329,163

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2023
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
ARCONIC INC.
Simula
Apr 13, 2023
Katapusan
Mar 8, 2024
TAGAL
330 araw
ID ng proyekto
23E00167

ORAS

Timeline

Simula

Apr 13, 2023

330 araw mula simula

Katapusan

Mar 8, 2024

LOKASYON

Nasaan ito

Coordinates: 13.49761, 120.88608

DETALYE

Detalye ng proyekto

Orihinal na pamagat
BASIC INFRASTRUCTURE PROGRAM- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE AT SITIO TALIPANAN, STA. 015+460-STA. 015+660 IN BRGY. ANIN

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.