Flood control · Brgy. San isidro
Construction of Puerto Galera urban drainage system, brgy. san isidro, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱53,074,971
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2024
- Bayan
- Puerto Galera
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)
- Simula
- Feb 8, 2024
- Katapusan
- Apr 2, 2025
- TAGAL
- 419 araw
- ID ng proyekto
- 24ED0036
ORAS
Timeline
Simula
Feb 8, 2024
419 araw mula simula
Katapusan
Apr 2, 2025
LOKASYON
Nasaan ito
Coordinates: 13.50291, 120.90637
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF PUERTO GALERA URBAN DRAINAGE SYSTEM, BRGY. SAN ISIDRO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Dulangan
IsinasagawaPuerto Galera2023
Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike, bry. dulangan, pto. galera, Oriental Mindoro
₱247.5 M
published na budgetSlope protection · Brgy. Anin
Tapos naPuerto Galera2023
Basic infrastructure program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of roads with slips, slope collapse and landslide at sitio talipanan, sta. 015+460-sta. 015+660 in brgy. anin
₱163.3 M
published na budgetConstruction · Brgy. Poblacion
IsinasagawaPuerto Galera2025
Construction of seawall, brgy. poblacion, Puerto Galera, Oriental Mindoro
₱47.5 M
published na budgetFlood control · Brgy. Tabinay
IsinasagawaPuerto Galera2025
Construction of flood control, phase 2, brgy. tabinay, Puerto Galera, Oriental Mindoro
₱47.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.