Skip to content

Flood control · Brgy. San isidro

Construction of Puerto Galera urban drainage system, brgy. san isidro, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱53,074,971

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2024
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)
Simula
Feb 8, 2024
Katapusan
Apr 2, 2025
TAGAL
419 araw
ID ng proyekto
24ED0036

ORAS

Timeline

Simula

Feb 8, 2024

419 araw mula simula

Katapusan

Apr 2, 2025

LOKASYON

Nasaan ito

Coordinates: 13.50291, 120.90637

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF PUERTO GALERA URBAN DRAINAGE SYSTEM, BRGY. SAN ISIDRO, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.