PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
2,746
sa buong lalawigan
PUBLISHED NA BUDGET
₱77.17 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
89%
2,451 sa 2,746 proyektong may katayuan
LOKASYON
2,487 proyekto ang nasa mapa. 259 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Rehab/reconst/upgrading of damaged paved Calapan south rd., or. Mindoro,K0103+000-K0103+594, K0107+(1016) | 2016 | ₱316,577,056 |
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Flood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro | 2024 | ₱289,496,392 |
| Basic infrastructure program (BIP)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase i, Naujan, or. Mindoro | 2024 | ₱287,199,000 |
| Sustainable infrastructure pojects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang ubi river, brgy. tagumpay, phase v, Naujan, or. Mindoro | 2024 | ₱280,178,100 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along dulangan river, brgy. evangelista, phase i, Naujan, Oriental Mindoro | 2024 | ₱280,114,708 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting m,ajor/strategic public buildings/fcilities- const. of road dike along m,ag-asawang tubig river, brgy. tagumpay, phase III, Naujan, Oriental Mindoro | 2024 | ₱280,065,668 |
Ipinapakita ang 341–350 sa 2,746, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Construction of missing links/new roads-Bulalacao- san jose- jct. mapaya road, occidental Mindoro | Bulalacao | 2025 | Isinasagawa | ₱57,014,698 |
| Preventive maintenance · Calapan North Road Preventive maintenance along Calapan north rd - K0011+005 - K0011+466, K0015+914 - K0016+180, Calapan city - Baco, Oriental Mindoro | – | 2025 | Tapos na | ₱56,981,253 |
| Rehabilitation · Brgy. Budburan Construction/improvement of access roads leading to declared tourism destination, nrj leading to mt. abinlay monkey trail and ecotourism, mangyan villages, brgy. budburan, Mansalay, Oriental Mindoro | Mansalay | 2018 | Tapos na | ₱55,674,528 |
| Bridge · Calapan South Road Replacement of permanent weak bridges of casiligan br. II (B00022MR) along Calapan south rd, Socorro, Oriental Mindoro | Socorro | 2024 | Tapos na | ₱54,992,080 |
| Construction of Victoria sports complex, Victoria, Oriental Mindoro | Victoria | 2021 | Tapos na | ₱54,500,640 |
| Rehabilitation · Calapan North Road Rehabilitation/reconstruction/upgrading of damaged paved roads along Calapan north road K0008+600 - K0009+000, K0011+403 - K0011+493, K0013+935 - K0014+224, K0015+058 - K0015+351, K0026+1065 - K0027+311, K0050+014 - K0050+644, K0050+985 - K0051+106, calap | – | 2019 | Tapos na | ₱53,759,822 |
| Flood control · Brgy. Ipil Const./maintenance of flood mitigation structures and drainage systems- construction of waterway from Bongabong diversion road to ipil creek (outfall), brgy. ipil, Bongabong, or Mindoro | Bongabong | 2023 | Isinasagawa | ₱53,630,901 |
| Off - carriageway improvement: shoulder paving Calapan south road - K0085+737 - K0085+938, K0090+750 - K0090+803, K0144+537 - K0144+835, K0147+063 - K0147+240, K0147+380 - K0148+568, K0148+980 - K0149+120, K0149+400 - K0149+680, K0149+900 - K0149+960, K01 | – | 2018 | Tapos na | ₱53,176,078 |
| Flood control · Brgy. San isidro Construction of Puerto Galera urban drainage system, brgy. san isidro, Oriental Mindoro | Puerto Galera | 2024 | Tapos na | ₱53,074,971 |
| Road widening-secondary roads- Calapan south rd - K0102 + 792.00 - K103 + 395.00, K0106 + 887.00 - K0107 + 000.00, K0108 + 502.00 - K0109 + 054.00, Bongabong, Oriental Mindoro | Bongabong | 2025 | Tapos na | ₱53,006,616 |