PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
12
ayon sa napiling filter
PUBLISHED NA BUDGET
₱503.3 M
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
92%
11 sa 12 proyektong may katayuan
LOKASYON
12 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike, bry. dulangan, pto. galera, Oriental Mindoro | 2023 | ₱247,496,508 |
| Basic infrastructure program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of roads with slips, slope collapse and landslide at sitio talipanan, sta. 015+460-sta. 015+660 in brgy. anin | 2023 | ₱163,329,163 |
| Construction of Puerto Galera municipal hall, phase II, balatero, Puerto Galera, Oriental Mindoro | 2023 | ₱29,699,660 |
| Road widening along Calapan north road - K0051+106 - K0052+000, Puerto Galera, Oriental Mindoro | 2023 | ₱21,606,990 |
| Construction of solar water system, municipality of Puerto Galera, Oriental Mindoro | 2023 | ₱9,677,609 |
| Construction of multi-purpose building at dulangan, Puerto Galera, Oriental Mindoro | 2023 | ₱4,949,990 |
| Concreting of road at aninuan, Puerto Galera, Oriental Mindoro | 2023 | ₱4,949,972 |
| Construction of water system in jbrgy. tabinay, Puerto Galera, orientall Mindoro | 2023 | ₱4,949,965 |
| Construction of drainage canal at poblacion, Puerto Galera, Oriental Mindoro | 2023 | ₱4,949,872 |
| Construction of circumferential road - white beach, barangay san isidro, Puerto Galera, Oriental Mindoro | 2023 | ₱4,949,547 |
Ipinapakita ang 1–10 sa 12, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Flood control · Brgy. Dulangan Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike, bry. dulangan, pto. galera, Oriental Mindoro | Puerto Galera | 2023 | Isinasagawa | ₱247,496,508 |
| Slope protection · Brgy. Anin Basic infrastructure program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of roads with slips, slope collapse and landslide at sitio talipanan, sta. 015+460-sta. 015+660 in brgy. anin | Puerto Galera | 2023 | Tapos na | ₱163,329,163 |
| Construction of Puerto Galera municipal hall, phase II, balatero, Puerto Galera, Oriental Mindoro | Puerto Galera | 2023 | Tapos na | ₱29,699,660 |
| Road widening along Calapan north road - K0051+106 - K0052+000, Puerto Galera, Oriental Mindoro | Puerto Galera | 2023 | Tapos na | ₱21,606,990 |
| Construction of solar water system, municipality of Puerto Galera, Oriental Mindoro | Puerto Galera | 2023 | Tapos na | ₱9,677,609 |
| Construction of multi-purpose building at dulangan, Puerto Galera, Oriental Mindoro | Puerto Galera | 2023 | Tapos na | ₱4,949,990 |
| Concreting of road at aninuan, Puerto Galera, Oriental Mindoro | Puerto Galera | 2023 | Tapos na | ₱4,949,972 |
| Construction of water system in jbrgy. tabinay, Puerto Galera, orientall Mindoro | Puerto Galera | 2023 | Tapos na | ₱4,949,965 |
| Construction of drainage canal at poblacion, Puerto Galera, Oriental Mindoro | Puerto Galera | 2023 | Tapos na | ₱4,949,872 |
| Construction · Brgy. San isidro Construction of circumferential road - white beach, barangay san isidro, Puerto Galera, Oriental Mindoro | Puerto Galera | 2023 | Tapos na | ₱4,949,547 |