Construction · Brgy. San jose
Sustainable infrastructure projects alleviating gaps (sipag)-construction of road at sitio bintalan 1 & 2, barangay san jose, Bongabong, Oriental Mindoro
Isinasagawa
PUBLISHED NA BUDGET
₱4,844,291
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2025
- Bayan
- Bongabong
- Katayuan
- Isinasagawa
- Kategorya
- Roads
- Contractor
- LEWIS GJANN CONSTRUCTION
- Simula
- Mar 25, 2025
- Katapusan
- -
- TAGAL
- -
- ID ng proyekto
- 25EI0149
ORAS
Timeline
- Walang petsa sa dokumento. Walang petsa ng simula at katapusan.
LOKASYON
Nasaan ito
Coordinates: 12.65724, 121.44911
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-CONSTRUCTION OF ROAD AT SITIO BINTALAN 1 & 2, BARANGAY SAN JOSE, BONGABONG, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Slope protection · Calapan South Road
Tapos naBongabong2021
Cluster 7: lip- construction of slope protection along Calapan south road, KO0118+080-KO0118+208; KO0118+240-KO0118+267; KO118+353-KO0118+460; KO0119+200-KO0119+287; KO0119+130-KO0119+190, Bongabong, or. Mindoro
₱198.0 M
published na budgetPreventive maintenance - secondary roads - Calapan south road - K0098+195 - K0099+447, Bongabong, Oriental Mindoro
Tapos naBongabong2023
₱77.5 M
published na budgetRoad widening - secondary roads - Calapan south road K0111+459 - K0113+000, Bongabong, Oriental Mindoro
Tapos naBongabong2023
₱57.8 M
published na budgetRoad widening along Calapan south road, K0100+400 - K0102+050, Bongabong , Oriental Mindoro
Tapos naBongabong2018
₱48.2 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.