Construction of Bansud river control, conrazon section, Bansud, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱19,599,917
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2021
- Bayan
- Bansud
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- GREEN ISLAND ENTERPRISES
- Simula
- Apr 8, 2022
- Katapusan
- Aug 12, 2022
- TAGAL
- 126 araw
- ID ng proyekto
- 21EI0157
ORAS
Timeline
Simula
Apr 8, 2022
126 araw mula simula
Katapusan
Aug 12, 2022
LOKASYON
Nasaan ito
Coordinates: 12.86673, 121.40849
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF BANSUD RIVER CONTROL, CONRAZON SECTION, BANSUD, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Conrazon
IsinasagawaBansud2025
Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river, brgy. conrazon, Bansud, or. Mindoro
₱230.1 M
published na budgetConst./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river brgy. conrazon (upstream), Bansud, or. Mindoro
IsinasagawaBansud2025
₱230.0 M
published na budgetFlood management program- const./maintenance of flood mitigation structures and drainage systems- const. of flood control structure along Bansud river (upstream), Bansud, Oriental Mindoro
IsinasagawaBansud2024
₱186.0 M
published na budgetFlood control · Brgy. Conrazon
Tapos naBansud2024
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of Bansud river control, sta. 6+909 - sta. 7+340 (upstream - right side), barangay conrazon, Bansud, Oriental Mindoro
₱67.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.