Flood control · Brgy. Conrazon
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of Bansud river control, sta. 6+909 - sta. 7+340 (upstream - right side), barangay conrazon, Bansud, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱67,547,177
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2024
- Bayan
- Bansud
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- ALBERTO UY CONSTRUCTION & DEVELOPMENT
- Simula
- Feb 15, 2024
- Katapusan
- Dec 29, 2024
- TAGAL
- 318 araw
- ID ng proyekto
- 24EI0019
ORAS
Timeline
Simula
Feb 15, 2024
318 araw mula simula
Katapusan
Dec 29, 2024
LOKASYON
Nasaan ito
Coordinates: 12.85601, 121.42316
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BANSUD RIVER CONTROL, STA. 6+909 - STA. 7+340 (UPSTREAM - RIGHT SIDE), BARANGAY CONRAZON, BANSUD, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Conrazon
IsinasagawaBansud2025
Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river, brgy. conrazon, Bansud, or. Mindoro
₱230.1 M
published na budgetConst./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river brgy. conrazon (upstream), Bansud, or. Mindoro
IsinasagawaBansud2025
₱230.0 M
published na budgetFlood management program- const./maintenance of flood mitigation structures and drainage systems- const. of flood control structure along Bansud river (upstream), Bansud, Oriental Mindoro
IsinasagawaBansud2024
₱186.0 M
published na budgetConstruction of sumagui river control (downstream), Bansud, Oriental Mindoro
Tapos naBansud2021
₱49.0 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.