Rehabilitation/ reconstruction of roads with slips, slope collapse and landslide- secondary roads,CSR (K0118+274-K0118+308), Bongabong, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱9,965,954

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2020
Katayuan
Tapos na
Kategorya
Roads
Contractor
ANDREM CONSTRUCTION SERVICE
Simula
Dec 15, 2020
Katapusan
Jul 15, 2021
TAGAL
212 araw
ID ng proyekto
20EI0118

ORAS

Timeline

Simula

Dec 15, 2020

212 araw mula simula

Katapusan

Jul 15, 2021

LOKASYON

Nasaan ito

Coordinates: 12.71137, 121.38217

DETALYE

Detalye ng proyekto

Orihinal na pamagat
REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS,CSR (K0118+274-K0118+308), BONGABONG, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.