Skip to content

Construction/maintenance of flood mitigation structures and drainage systems, construction of flood control structure, cagancan river, sitio bait, panaytayan, Mansalay, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱14,698,429

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2020
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
D.M. MALIWANAG BUILDERS AND ENTERPRISES
Simula
Feb 20, 2020
Katapusan
Aug 31, 2020
TAGAL
193 araw
ID ng proyekto
20EI0040

ORAS

Timeline

Simula

Feb 20, 2020

193 araw mula simula

Katapusan

Aug 31, 2020

LOKASYON

Nasaan ito

Coordinates: 12.47052, 121.39788

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CAGANCAN RIVER, SITIO BAIT, PANAYTAYAN, MANSALAY, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.