Skip to content

Construction · Brgy. Don pedro

Sustainable infrastructure projects alleviating gaps (sipag)-construction of cagancan river control, sta. 0+028-sta. 0+920 (rs); sta. 0+345-sta. 0+920 (ls), brgy. don pedro, Mansalay, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱144,740,431

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2022
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
D.M. MALIWANAG BUILDERS AND ENTERPRISES (32589) / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
Simula
Mar 24, 2022
Katapusan
Apr 30, 2023
TAGAL
402 araw
ID ng proyekto
22E00061

ORAS

Timeline

Simula

Mar 24, 2022

402 araw mula simula

Katapusan

Apr 30, 2023

LOKASYON

Nasaan ito

Coordinates: 12.48241, 121.41947

DETALYE

Detalye ng proyekto

Orihinal na pamagat
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-CONSTRUCTION OF CAGANCAN RIVER CONTROL, STA. 0+028-STA. 0+920 (RS); STA. 0+345-STA. 0+920 (LS), BRGY. DON PEDRO, MANSALAY, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.