Skip to content

Flood control · Brgy. Sto

Construction/maintenance of flood mitigation structures and drainage systems, construction of brgy. sto. niÑo flood control, Pinamalayan, Oriental Mindoro

Tapos naHindi tiyak ang bayan

PUBLISHED NA BUDGET

₱39,199,954

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2020
Bayan
Hindi tiyak ang bayan
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)
Simula
Feb 23, 2020
Katapusan
Sep 7, 2020
TAGAL
197 araw
ID ng proyekto
20EI0035

ORAS

Timeline

Simula

Feb 23, 2020

197 araw mula simula

Katapusan

Sep 7, 2020

LOKASYON

Nasaan ito

Coordinates: 13.04946, 121.42481

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BRGY. STO. NIÑO FLOOD CONTROL, PINAMALAYAN, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.