Skip to content

Flood control · Brgy. Malamig sect

Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1

IsinasagawaHindi tiyak ang bayan

PUBLISHED NA BUDGET

₱289,496,788

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2022
Bayan
Hindi tiyak ang bayan
Katayuan
Isinasagawa
Kategorya
Flood Control and Drainage
Contractor
ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196) / STX ENTERPRISES
Simula
Oct 31, 2022
Katapusan
-
TAGAL
-
ID ng proyekto
22E00165

ORAS

Timeline

- Walang petsa sa dokumento. Walang petsa ng simula at katapusan.

LOKASYON

Nasaan ito

Coordinates: 12.85518, 121.46192

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.