Skip to content

Construction of flood mitigation structures and drainage systems, construction of wawan river control, Mansalay, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱18,913,002

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2018
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
D.M. MALIWANAG BUILDERS AND ENTERPRISES (32589) / SIXTEEN ENTERPRISES-CALAPAN BRANCH
Simula
Apr 22, 2018
Katapusan
Jan 9, 2019
TAGAL
262 araw
ID ng proyekto
18EI0091

ORAS

Timeline

Simula

Apr 22, 2018

262 araw mula simula

Katapusan

Jan 9, 2019

LOKASYON

Nasaan ito

Coordinates: 12.45216, 121.40960

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF WAWAN RIVER CONTROL, MANSALAY, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.