Construction of flood mitigation structures, construction of flood control balete river, Gloria, Oriental Mindoro
Tapos naHindi tiyak ang bayan
PUBLISHED NA BUDGET
₱11,208,794
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2017
- Bayan
- Hindi tiyak ang bayan
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- ALBERTO UY CONSTRUCTION & DEVELOPMENT
- Simula
- Aug 28, 2017
- Katapusan
- Dec 8, 2017
- TAGAL
- 102 araw
- ID ng proyekto
- 17EI0088
ORAS
Timeline
Simula
Aug 28, 2017
102 araw mula simula
Katapusan
Dec 8, 2017
LOKASYON
Nasaan ito
Coordinates: 12.67792, 121.38251
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES, CONSTRUCTION OF FLOOD CONTROL BALETE RIVER, GLORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Metolza section
Tapos naNaujan2023
Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro
₱289.5 M
published na budgetFlood control · Brgy. Metolza section
Tapos naNaujan2023
Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro
₱289.5 M
published na budgetFlood control · Brgy. Malamig sect
IsinasagawaHindi tiyak ang bayan20222 bahagi ng daan
Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1
₱289.5 M
published na budgetFlood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro
Tapos naNaujan2024
₱289.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.