PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
2,746
sa buong lalawigan
PUBLISHED NA BUDGET
₱77.17 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
89%
2,451 sa 2,746 proyektong may katayuan
LOKASYON
2,487 proyekto ang nasa mapa. 259 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Rehab/reconst/upgrading of damaged paved Calapan south rd., or. Mindoro,K0103+000-K0103+594, K0107+(1016) | 2016 | ₱316,577,056 |
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Flood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro | 2024 | ₱289,496,392 |
| Basic infrastructure program (BIP)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase i, Naujan, or. Mindoro | 2024 | ₱287,199,000 |
| Sustainable infrastructure pojects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang ubi river, brgy. tagumpay, phase v, Naujan, or. Mindoro | 2024 | ₱280,178,100 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along dulangan river, brgy. evangelista, phase i, Naujan, Oriental Mindoro | 2024 | ₱280,114,708 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting m,ajor/strategic public buildings/fcilities- const. of road dike along m,ag-asawang tubig river, brgy. tagumpay, phase III, Naujan, Oriental Mindoro | 2024 | ₱280,065,668 |
Ipinapakita ang 651–660 sa 2,746, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Rehabilitation · Brgy. Hall Construction/improvement/rehabilitation/completion of various multi - purpose buildings (covered court, brgy. hall, evacuation center), Victoria, Oriental Mindoro | Victoria | 2022 | Tapos na | ₱27,439,547 |
| Flood control · Brgy. Sto Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of pula river control, brgy. sto. niÑo section, location: Pinamalayan, Oriental Mindoro | – | 2021 | Tapos na | ₱27,119,519 |
| Asphalt overlay of Calapan north road, KO008+590-KO008+29; KO013+935-KO014+368; KO049+958-KO050+644; KO050+984-KO051+110, Calapan city, Baco, Puerto Galera, Oriental Mindoro | – | 2016 | Tapos na | ₱27,067,638 |
| Rehabilitation/ reconstruction of roads with slips, slope collapse and landslide - tertiary roads - Calapan south rd - K0187+690 - K0187+934.80, Bulalacao, Oriental Mindoro | Bulalacao | 2022 | Tapos na | ₱26,928,181 |
| Flood control · Calapan South Road Construction/upgrading/rehabilitation of drainage along Calapan south road K0056+142 - K0056+350, K0058+523 - K0059+545, Socorro, Oriental Mindoro | Socorro | 2022 | Tapos na | ₱26,754,973 |
| Rehabilitation/ reconstruction of roads with slips, slope collapse and landslide - tertiary roads - Calapan south rd - K0189+488 - K0189+753.20, K0189+936 - K0190+011, Bulalacao, Oriental Mindoro | Bulalacao | 2022 | Tapos na | ₱26,669,943 |
| Construction of 3 units 2 storey ICT lab, 2 storey sci lab, 1 - 2 storey reg. workshop at san agustin NHS, Naujan, Oriental Mindoro | Naujan | 2018 | Tapos na | ₱26,636,756 |
| Construction of 3 units 2 storey ICT lab, 2 storey sci lab, 1 - 2 storey reg. workshop at aurelio arago mnhs, Victoria, Oriental Mindoro | Victoria | 2018 | Tapos na | ₱26,636,736 |
| Construction of 4 storey / 16 classrooms of aurelio arago mnhs, Victoria, Oriental Mindoro | Victoria | 2016 | Tapos na | ₱26,583,945 |
| Bridge · Calapan South Road Widening of permanent bridges: agsalin br. (B00230MR) along Calapan south road, Gloria, Oriental Mindoro | – | 2021 | Tapos na | ₱26,459,956 |