PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
277
ayon sa napiling filter
PUBLISHED NA BUDGET
₱6.50 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
100%
276 sa 277 proyektong may katayuan
LOKASYON
277 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Preventive maintenance along Calapan south road, KO064+000-KO069+180, southern Mindoro | 2022 | ₱279,847,370 |
| Rehabilitation/reconstruction of roads with slips, slope collapse and landslide - Calapan north road, KO042+740-KO042+1008, KO043+060-KO043+170, Oriental Mindoro | 2022 | ₱154,882,168 |
| Const. of missing links/new roads - Victoria sablayan (Mindoro cross island road), package i, sta. 0+0472.90-sta. 0+670.30; sta. 0+670.30-sta. 0+771.30, Oriental Mindoro | 2022 | ₱144,749,776 |
| Construction of river control project at subaan river (phase i), sta. 00+000.00-sta. 00+882.60, San Teodoro, Oriental Mindoro | 2022 | ₱144,749,613 |
| Construction of river control project at subaan river (phase II), San Teodoro, Oriental Mindoro, sta. 00+882.60-sta. 02+042.27 | 2022 | ₱144,748,797 |
| Sustainable infrastructure projects alleviating gaps (sipag)-construction of cagancan river control, sta. 0+028-sta. 0+920 (rs); sta. 0+345-sta. 0+920 (ls), brgy. don pedro, Mansalay, Oriental Mindoro | 2022 | ₱144,740,431 |
| Coastal roads/causeway for environmental protection/conservation - construction of Roxas bypass/tourism coastal road at brgy. dangay, sta. 00+000-sta. 00+277.80, Roxas, or. Mindoro | 2022 | ₱136,136,373 |
| Construction/improvement/rehabilitation/completion of various multi-purpose buildings (covered court, brgy. hall, evacuation center), Calapan city, Oriental Mindoro | 2022 | ₱131,722,438 |
Ipinapakita ang 51–60 sa 277, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Road widening - secondary roads, along Calapan south road K0145+637 - K0146+530, Mansalay, Oriental Mindoro | Mansalay | 2022 | Tapos na | ₱37,238,494 |
| Construction of phase i of the bureau of fisheries and aquatic resources (bfar) mimaropa regional office building, Calapan city, Oriental Mindoro | Calapan City | 2022 | Tapos na | ₱34,299,859 |
| Construction/upgrading/rehabilitation of drainage along national roads secondary roads - Calapan south road - K0064+ (-249) - K0064+833, Pinamalayan, Oriental Mindoro | Pinamalayan | 2022 | Tapos na | ₱34,299,435 |
| Construction · Brgy. Roma Sustainable infrastructure projects alleviating gaps (sipag) - access roads - construction of road, barangay maliwanag - barangay roma, Mansalay, Oriental Mindoro | Mansalay | 2022 | Tapos na | ₱29,399,821 |
| Construction · Brgy. Bangkatan Construction of road from sitio rubia to sta. ana, barangay bangkatan, Baco, Oriental Mindoro | Baco | 2022 | Tapos na | ₱29,399,452 |
| Concreting of roads, Socorro, Oriental Mindoro | Socorro | 2022 | Tapos na | ₱28,638,436 |
| Bridge · Brgy. Sabang Sustainable infrastructure projects alleviating gaps (sipag) - bridges from the national roads, construction of bridge, barangay sabang, Pinamalayan, Oriental Mindoro | Pinamalayan | 2022 | Tapos na | ₱27,514,300 |
| Rehabilitation · Brgy. Hall Construction/improvement/rehabilitation/completion of various multi - purpose buildings (covered court, brgy. hall, evacuation center), Victoria, Oriental Mindoro | Victoria | 2022 | Tapos na | ₱27,439,547 |
| Rehabilitation/ reconstruction of roads with slips, slope collapse and landslide - tertiary roads - Calapan south rd - K0187+690 - K0187+934.80, Bulalacao, Oriental Mindoro | Bulalacao | 2022 | Tapos na | ₱26,928,181 |
| Flood control · Calapan South Road Construction/upgrading/rehabilitation of drainage along Calapan south road K0056+142 - K0056+350, K0058+523 - K0059+545, Socorro, Oriental Mindoro | Socorro | 2022 | Tapos na | ₱26,754,973 |