PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
2,746
sa buong lalawigan
PUBLISHED NA BUDGET
₱77.17 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
89%
2,451 sa 2,746 proyektong may katayuan
LOKASYON
2,487 proyekto ang nasa mapa. 259 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Rehab/reconst/upgrading of damaged paved Calapan south rd., or. Mindoro,K0103+000-K0103+594, K0107+(1016) | 2016 | ₱316,577,056 |
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Flood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro | 2024 | ₱289,496,392 |
| Basic infrastructure program (BIP)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase i, Naujan, or. Mindoro | 2024 | ₱287,199,000 |
| Sustainable infrastructure pojects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang ubi river, brgy. tagumpay, phase v, Naujan, or. Mindoro | 2024 | ₱280,178,100 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along dulangan river, brgy. evangelista, phase i, Naujan, Oriental Mindoro | 2024 | ₱280,114,708 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting m,ajor/strategic public buildings/fcilities- const. of road dike along m,ag-asawang tubig river, brgy. tagumpay, phase III, Naujan, Oriental Mindoro | 2024 | ₱280,065,668 |
Ipinapakita ang 371–380 sa 2,746, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Construction of abaton river control at Calapan city, Oriental Mindoro | Calapan City | 2025 | Tapos na | ₱48,999,943 |
| Construction · Brgy. San carlos Construction of mag-asawang tubig river control along barangay san carlos, Naujan, Oriental Mindoro | Naujan | 2024 | Tapos na | ₱48,999,941 |
| Flood control · Brgy. San aquilino section Construction/rehabilitation of flood mitigation facilities within major river basins and principal river, construction of baroc river control, brgy. san aquilino section, sta. 0+000 - sta. 0+796, Roxas, Oriental Mindoro | Roxas | 2022 | Tapos na | ₱48,999,932 |
| Construction of sumagui river control (downstream), Bansud, Oriental Mindoro | Bansud | 2021 | Tapos na | ₱48,999,925 |
| Construction/upgrading/rehabilitation of drainage along national roads - secondary roads - Calapan south rd - K0069+476 - K0071+167.10, K0071+300 - K0071+775, Pinamalayan, Oriental Mindoro | Pinamalayan | 2022 | Tapos na | ₱48,999,921 |
| Construction of malitbog river control structure (downstream), Bongabong, Oriental Mindoro | Bongabong | 2022 | Tapos na | ₱48,999,912 |
| Flood control · Brgy. San miguel section Construction/rehabilitation of flood mitigation facilities within major river basins and principal river, construction of baroc river control, brgy. san miguel section, sta. 0+000 - sta. 0+802, Roxas Oriental Mindoro | Roxas | 2022 | Tapos na | ₱48,999,911 |
| Construction/maintenance of flood mitigation structure structures and drainage systems, construction of orconuma river control (upstream), abutment b, Bongabong, Oriental Mindoro | Bongabong | 2023 | Tapos na | ₱48,999,818 |
| Construction · Brgy. Camansihan Construction of bucayao river control along barangay camansihan, Calapan city, Oriental Mindoro | Calapan City | 2024 | Tapos na | ₱48,999,818 |
| Construction of flood mitigation structures and drainage systems, construction of san miguel river control structure, Roxas, Oriental Mindoro | Roxas | 2018 | Tapos na | ₱48,999,757 |